Antillean Guilder
Argentina Peso
Aruban Florin
Australian Dollar
Bahamian Dollar
Barbadian Dollar
Belize Dollar
Bermudan Dollar
Bitcoin
Brazil Real
Bulgarian Lev
Canadian Dollar
Cayman Islands Dollar
Chile Peso
China Yuan Renminbi
Columbian Peso
Costa Rican Colón
Czech Republic Koruna
Denmark Krone
Dominican Peso
Euros
Fiji Dollar
Ghanaian Cedi
Honduras Lempira
Hong Kong Dollar
Hungary Forint
Iceland Krona
India Rupee
Indonesia Rupiah
Israel Shekel
Jamaican Dollar
Japan Yen
Korea (South) Won
Lebanese Pound
Malaysia Ringgit
Mexico Peso
Mauritian Rupee
New Zealand Dollar
Nicaraguan Córdoba
Nigerian Naira
Norway Krone
Pakistan Rupee
Panamanian Balboa
Peruvian Sol
Philippine Peso
Poland Zloty
Russia Ruble
Singapore Dollar
South Africa Rand
Sweden Krona
Switzerland Franc
Taiwan New Dollar
Thailand Baht
Trinidad & Tobago Dollar
Turkey Lira
United Arab Emirates Dirham
United Kingdom Pound
Uruguayan Peso
US Dollar
Viet Nam Dong
Qatar Riyal
Prime commercial/industrial development Ideally located for local, regional distribution Zoning M1 (allows for commercial/industrial) IDOT 2030 proposed traffic count - 30,000 vehicles per day on Route 6000; 26,000 vehicles per day on 45/52 Sewer and water to site 5-year property tax abatement and sales tax exemption for new construction. Labor force of 400,000 within 30-minute drive Bourbonnais Advantages: Highly skilled labor force; Regional labor force of approximately 5 million; Sales tax at 6.25%; Lower property taxes in Kankakee County; Attractive wages scale; 10% population growth since 2000; Within 45 miles of Chicago market; Upscale industrial park standards; Within 125 miles of Indianapolis. Development Tools: Tax increment financing; Sales tax sharing; Enterprise zone; Fast track permits; All utilities within close proximity; Infrastructure investment features. WATER/SEWER - AQUA ILLINOIS Water: There is a 16' main going to the site, which would be able to provide approximately 3.5 to 4.5 MGD, and additional capacity would be available upon request and execution of a water supply agreement with Aqua. Sewer: There is an 18' main at Bourbonnais Parkway that can send 3.5 million gallons per day (MGD) through the interconnection with Bourbonnais. Additional capacity of 1 MGD through the Kankakee connection for a total of 4.5 MGD. POWER - COMED Abundant power available with existing transmission and distribution lines run along Route 50 which service the site. GAS - NICOR GAS Gas Service provided by Nicor Gas.